Ask The Expert: Take The Time To Get It Right

Principal, Jim Toby, explains how taking the time to get it right will lead to faster approvals, better plans and overall

Jim Toby, P.E., Principal, Civil Engineer. L&B blog posts.

Ask The Expert: Take The Time To Get It Right

We all know that driving too fast can kill, but speed can also kill your project. If you were to ask any quality architect or engineer how they are doing, you are likely to hear that they’re very busy! Yes, our economy is good and as such getting the right team on a project can be a challenge, especially if you are in a hurry to get things moving. However, it is more important than ever to not use timing solely as a determination of hiring the right team.

I have explained about the importance of quality and the perils of going with the low-cost proposal in my last article, but it’s equally important to give a quality firm the time they need to do a project correctly. I am sure almost all of us can think back to a school paper we wrote at the last minute and thinking that if you had more time, it would have been much better and may have resulted in a better grade. The same holds true for engineers and surveyors. Rushing can lead to inadequate surveys or designs that are not well thought out and, even if approved for permit, could lead to construction issues. It is no surprise that the quality firms are the ones that might have greater lead times. Typically, firms that can jump on a project immediately are not the ones that will produce quality results.

Our motto: Treat all projects as if this were your own project. Give it the care it deserves, do not rush, and get it done right! Getting it right the first time will lead to faster approvals, better plans, and overall project quality.

As professional civil engineers and land surveyors, we know that quality can make or break a project. Unfortunately, too many people look at our profession as a commodity, and if a firm can finish a project cheaper and faster, that’s what many clients will go with. As with cost not making a project cheaper, faster does not actually mean the project will be done faster.

The hiring of their design professionals based solely on their timelines (and cost!) ended up costing the client several months of headache! Imagine the interest costs of six to eight month of mortgage payments on a multi-million dollar lot and
the frustration of months lost due to inadequate plans!

Aside from speed, bringing the engineer onto the team early can also save time and money! We are routinely asked to join a team at the last minute to do a grading and drainage plan. However, as with a lot of projects, our involvement is better
served if we are brought on early. Most projects require some sort of storm water management and the days of doing a quick grading plan are long gone. It is standard practice to require room on a project for bioretention and other stormwater quality measures.

If we’re not brought on early and allowed to work with the design team up front to properly size and place the required measures, we typically have to ask the design team to go back to the drawing board and allow for the required measures to be designed into the layout. If this happens, the entire design team must reassess their designs to allow for the required measures. Bringing the entire team into the project at the beginning allows for complete collaboration and can help prevent costly and timely redesign.

JIM TOBY is a principal and civil engineer with Lea & Braze Engineering, Inc. He can be reached at jtoby@leabraze.com.

Leave a Comment

Your email address will not be published. Required fields are marked *

Request
for
Proposal